SAMI ABDULAZEEZ TURKI ALDOORI

 Homepage My Photos

Aviation Mechanical Engineer / Power Generation Installation & Maintenance

1 

Personal Data

Nationality     IRAQI
Date of Birth 27/11/1961
Marital status Married
Language Arabic (fluent), English (good)

Mobile

+964 7902 333057

Education

B.Sc. in Mechanical Engineering 1983,University of Technology

Baghdad-Iraq

1

1

1

1

Veiw Power Generation (Flash)

1

1

1

1

Email:

samialdoory@gmail.com

sturki@stcsal.com

Iraqi Engineers Union Member (since 1983)

Employments

 

Jul 2021 – On going:

                   Senior Mechanical Engineer at STC sal company.

Rotating Equipment services department consultant.

 

Oct 2019 – Mar 2020:

                   Project Manager with OGC Services company

K1/K2 Compressor Modification Project- Basra Gas Company.

 

Oct 2018 – Jul 2019:

                     Site Manager with Al Rasikh & Merjal JV company

Full Refurbishment of Turbines and Generator of Unit 3 under Siemens AG.

 

Mar 2018 – Apr 2018:

                     Project consultant with Al Rasikh & Merjal JV company

Preparations for Mullah Abdullah Power plant (6xF6B) Rehabilitation Project.

  • Preparing project documents and attend audit and direct technical meeting with GE company to discuss scope of work in details.
  • Working in Project Time schedule.
  • Issuing project tools and equipment list.

Sep 2017 – Dec 2017:

                      Site Manager @ Technical Resources for Oil, Gas and Power plants services co.

Preparations for Mullah Abdullah Power plant (6X F6B) Rehabilitation Project.

  • Preparing project documents and contract volumes.
  • Issuing Project Time schedule.
  • Issuing project tools and equipment list.
  • Interviews and evaluation for project Candidates. 

 

Apr 2016 – Dec 2016:

                       Technical Advisor as (Vendor) / Mitsubishi Hitachi Power System

Badra Oil Field – Samsung Engineering Co. Ltd. – Wasit /Iraq.

Advising Samsung on specific jobs related to H-25 GTG installation

  • Final alignment GT-LOM for (5) H-25 Gas Turbines.
  • Fixing Center Key and Guide Key of turbine base.
  • Lube oil flushing.

 

 

Feb 2012-May 2015                     (Photos)

                             

                            Site Manager / Baghdad Company

 

 

Mulla Abdulla power plant.

Rehabilitation Of (11) Fr-5 Units with all BOP systems refurbishment.

  • Completion of major refurbish of 4 units with replacing Thermal tubes by refurbished ones.
  • Replacement of Brush Gen. STATOR for Unit 6 with all needed centering and alignment processes.
  • Refurbish of main and aux. Transformers, Black start units, Compressed air plant, Fire Fighting system and Cooling water towers.
  • Re centering of Units new packages and making First and final alignment.
  • Two units Upgrading of control systems from mark II to Mark VIe.
  • Making many modifications on units systems to suit new parts installation.

 

 

 

July 2010- Oct 2010:       (certificate)   (certificate)     (Photos)

                                

                             TA Team Leader / Baghdad Company

 

 

Al Taji power plant.

U#3 & U#5 (H-25) Gas Turbine Rehabilitation work technical advisor under Hitachi Co. Supervision.

 

2007-2009:      (certificate)         (Photos)

Leader of Mechanical Dep. /Baghdad Company.

  • Installation of two F9 Units in Al Qudas Expansion PS.
  • Management of human and heavy equipments resources.
  • Mechanical activities planning and scheduling.
  • Supervision most mechanical activities :
    • Load shaft erection.
    • Diffuser installation.
    • Centering packages on foundation (First alignment).
    • Exhaust and Stack system preassembling and installation.
    • Air inlet system preassembling and erection.
    • Acoustical package and ventilation system erection.
    • On base piping erection.
    • Installation of Skids.
    • BOP (Boiler, Forwarding, Fuel treatment & Water treatment) skids installation.
    • Final alignment.

2006-2007:     (certificate)          (Photos)

Senior Engineer in Baghdad Company @ TAJI Power Plant.

  • Dismantling (Three) HITACHI frame 5 Units.
  • Rehabilitation (Three) HITACHI frame 5 Units.
    • Replacement of generator rotor.
    • Replacement of Reduction Gear.
    • Gen. section rehabilitation activities.
    • Gen. Rotor to R/G alignment.
    • GAC unit Replacement
    • Control unit Replacement
    • Air inlet system disassemble/Reassemble
    • Unit Final alignment
  • New installation of 3 units HITACHI (H-25).
    • Centering of Reduction Gear on foundation.
    • Centering of generator package and GT package on foundation (First alignment).
    • Final alignment.
    • Supervision most mechanical activities :
      • Air inlet erection.
      • Exhaust duct erection.
      • Load shaft installation.
      • Ventilation system erection.
      • Generator cooler erection.
      • Load compartment erection.
      • Lube oil piping.

2004-2005:      (certificate1)    (certificate2)       (Photos)

Site Mechanical Engineer (Baghdad - south power Generation Plant):

  • Erection of fin fan cooler (two turbine systems frame 9).
  • Erection and aligning of air inlet structure (two turbine systems frame 9).
  • Assembling and erection of air inlet system (two turbine systems frame 9).
  • Supervision external painting process (two turbine systems frame 9).

1997 - 2003 :

Aviation supervisor / Manager / Baghdad / IRAQ:

  • Technical manager for aircrafts & turbo jet engines repair and maintenance, spare parts control, man power Control, and enhancement of maintenance technical instructions.
  • Mechanical member in aircrafts accidents and crashes investigation group.

1983 - 1997 :

Aviation Maintenance and Repair Mechanical Chief Engineer / IRAQ: 

  • Mechanical engineer for maintenance and repair of Aircrafts systems, gas turbine engines (hydraulic, fuel, air, nitrogen, control sys., fire fighting ...etc) including its components.
  • Theoretical and practical teaching of young pilots and aviation engineers.

Training    (certificate)      (Photos)

  • 11/4-16/4/2016 Training course @ Mitsubishi Hitachi power systems Ltd. (JAPAN) for H-25 Gas turbine Generator construction, final Alignment and Lube Oil system flushing as TA Mechanical engineer for (Badra oil field) project.
  • 14/7/2010-16/7/2010 H-25 Gas turbine hot path and major repair class room training / Hitachi Co.(Amman).
  • May 2007- H-25 installation training class room / Hitachi Co. (Amman).
  • 21/5/2006 -25/5/2006 Frame 5 power plant rehabilitation Class room training / Hitachi Co. (Amman).
  • 12/3/2006 – 8/4/2006 Frame 5 power plant rehabilitation training at Egat –Thailand / Hitachi Co.
  • 1/3/2006 -7/3/2006 Frame 5 power plant rehabilitation Class room training / Hitachi Co. (Amman).