SAMI ABDULAZEEZ TURKI ALDOORI
Aviation Mechanical Engineer / Power Generation Installation & Maintenance
1
Personal Data
Nationality | IRAQI |
Date of Birth | 27/11/1961 |
Marital status | Married |
Language | Arabic (fluent), English (good) |
Mobile | +964 7902 333057 |
Education
B.Sc. in Mechanical Engineering 1983,University of Technology
Baghdad-Iraq
1
1
1
1
Veiw Power Generation (Flash)
1
1
1
1
Employments
Jul 2021 – On going:
Senior Mechanical Engineer at STC sal company.
Rotating Equipment services department consultant.
Oct 2019 – Mar 2020:
Project Manager with OGC Services company
K1/K2 Compressor Modification Project- Basra Gas Company.
Oct 2018 – Jul 2019:
Site Manager with Al Rasikh & Merjal JV company
Full Refurbishment of Turbines and Generator of Unit 3 under Siemens AG.
Mar 2018 – Apr 2018:
Project consultant with Al Rasikh & Merjal JV company
Preparations for Mullah Abdullah Power plant (6xF6B) Rehabilitation Project.
- Preparing project documents and attend audit and direct technical meeting with GE company to discuss scope of work in details.
- Working in Project Time schedule.
- Issuing project tools and equipment list.
Sep 2017 – Dec 2017:
Site Manager @ Technical Resources for Oil, Gas and Power plants services co.
Preparations for Mullah Abdullah Power plant (6X F6B) Rehabilitation Project.
- Preparing project documents and contract volumes.
- Issuing Project Time schedule.
- Issuing project tools and equipment list.
- Interviews and evaluation for project Candidates.
Apr 2016 – Dec 2016:
Technical Advisor as (Vendor) / Mitsubishi Hitachi Power System
Badra Oil Field – Samsung Engineering Co. Ltd. – Wasit /Iraq.
Advising Samsung on specific jobs related to H-25 GTG installation
- Final alignment GT-LOM for (5) H-25 Gas Turbines.
- Fixing Center Key and Guide Key of turbine base.
- Lube oil flushing.
Feb 2012-May 2015 (Photos)
Site Manager / Baghdad Company
Mulla Abdulla power plant.
Rehabilitation Of (11) Fr-5 Units with all BOP systems refurbishment.
- Completion of major refurbish of 4 units with replacing Thermal tubes by refurbished ones.
- Replacement of Brush Gen. STATOR for Unit 6 with all needed centering and alignment processes.
- Refurbish of main and aux. Transformers, Black start units, Compressed air plant, Fire Fighting system and Cooling water towers.
- Re centering of Units new packages and making First and final alignment.
- Two units Upgrading of control systems from mark II to Mark VIe.
- Making many modifications on units systems to suit new parts installation.
July 2010- Oct 2010: (certificate) (certificate) (Photos)
TA Team Leader / Baghdad Company
Al Taji power plant.
U#3 & U#5 (H-25) Gas Turbine Rehabilitation work technical advisor under Hitachi Co. Supervision.
2007-2009: (certificate) (Photos)
Leader of Mechanical Dep. /Baghdad Company.
- Installation of two F9 Units in Al Qudas Expansion PS.
- Management of human and heavy equipments resources.
- Mechanical activities planning and scheduling.
- Supervision most mechanical activities :
- Load shaft erection.
- Diffuser installation.
- Centering packages on foundation (First alignment).
- Exhaust and Stack system preassembling and installation.
- Air inlet system preassembling and erection.
- Acoustical package and ventilation system erection.
- On base piping erection.
- Installation of Skids.
- BOP (Boiler, Forwarding, Fuel treatment & Water treatment) skids installation.
- Final alignment.
2006-2007: (certificate) (Photos)
Senior Engineer in Baghdad Company @ TAJI Power Plant.
- Dismantling (Three) HITACHI frame 5 Units.
- Rehabilitation (Three) HITACHI frame 5 Units.
- Replacement of generator rotor.
- Replacement of Reduction Gear.
- Gen. section rehabilitation activities.
- Gen. Rotor to R/G alignment.
- GAC unit Replacement
- Control unit Replacement
- Air inlet system disassemble/Reassemble
- Unit Final alignment
- New installation of 3 units HITACHI (H-25).
- Centering of Reduction Gear on foundation.
- Centering of generator package and GT package on foundation (First alignment).
- Final alignment.
- Supervision most mechanical activities :
- Air inlet erection.
- Exhaust duct erection.
- Load shaft installation.
- Ventilation system erection.
- Generator cooler erection.
- Load compartment erection.
- Lube oil piping.
2004-2005: (certificate1) (certificate2) (Photos)
Site Mechanical Engineer (Baghdad - south power Generation Plant):
- Erection of fin fan cooler (two turbine systems frame 9).
- Erection and aligning of air inlet structure (two turbine systems frame 9).
- Assembling and erection of air inlet system (two turbine systems frame 9).
- Supervision external painting process (two turbine systems frame 9).
1997 - 2003 :
Aviation supervisor / Manager / Baghdad / IRAQ:
- Technical manager for aircrafts & turbo jet engines repair and maintenance, spare parts control, man power Control, and enhancement of maintenance technical instructions.
- Mechanical member in aircrafts accidents and crashes investigation group.
1983 - 1997 :
Aviation Maintenance and Repair Mechanical Chief Engineer / IRAQ:
- Mechanical engineer for maintenance and repair of Aircrafts systems, gas turbine engines (hydraulic, fuel, air, nitrogen, control sys., fire fighting ...etc) including its components.
- Theoretical and practical teaching of young pilots and aviation engineers.
Training (certificate) (Photos)
- 11/4-16/4/2016 Training course @ Mitsubishi Hitachi power systems Ltd. (JAPAN) for H-25 Gas turbine Generator construction, final Alignment and Lube Oil system flushing as TA Mechanical engineer for (Badra oil field) project.
- 14/7/2010-16/7/2010 H-25 Gas turbine hot path and major repair class room training / Hitachi Co.(Amman).
- May 2007- H-25 installation training class room / Hitachi Co. (Amman).
- 21/5/2006 -25/5/2006 Frame 5 power plant rehabilitation Class room training / Hitachi Co. (Amman).
- 12/3/2006 – 8/4/2006 Frame 5 power plant rehabilitation training at Egat –Thailand / Hitachi Co.
- 1/3/2006 -7/3/2006 Frame 5 power plant rehabilitation Class room training / Hitachi Co. (Amman).